以太坊 Layer 2 项目 Zero Network 宣布关闭,多个协议接连停运

深潮 TechFlow 消息,5 月 22 日,据 The Block 报道,以太坊 Layer 2 项目 Zero Network 宣布将于近期正式关闭,距其上线仅约 1.5 年。Zero Network 由 Zerion 团队于 2024 年 11 月推出,定位为首个 EVM 兼容的全免 Gas 费 Rollup,旨在降低用户门槛、推动主流采用。团队表示,将把资源集中于 Zerion 的 API 和钱包业务。用户需在 7 月底前将 NFT、ETH 及其他代币从 Zero 网络桥接转出,目前桥接入金功能已暂停。
Disclaimer: OKX Orbit content is provided for informational purposes only. Learn more
Replies
Related Flash News
Matrixport-linked addresses "Top 1 in ETH long positions": The floating loss on ETH long positions at Matrixport-linked addresses expanded to 7.01 million
OKX will support Base network upgrades
BlackRock transferred 1,587 BTC and 17,815 ETH to Coinbase
Opinion: Web3 doesn't need a savior; Ethereum should remain highly neutral
Data: Tokenized stock market cap surpasses $1.6 billion, with Ethereum leading with a 41.1% market share
Analyst: $1.6 billion worth of Bitcoin options expire today, with lower volatility expectations
Data: Bitcoin and Ethereum options with a nominal value of $1.88 billion are expiring and delivering
Pieverse (PIEVERSE)現已在KuCoin上線
Circle CEO: cirBTC is about to go live and will be held by a regulated entity under the group
Blackstone ETH ETF saw an outflow of $37.8 million, with a position of 288,697 ETH


